Because the Seymour Capilano Filtration Plant is higher in elevation than the Capilano Reservoir, pressure is created when treated water is returned to the Capilano pump station for distribution. A turbine in the Capilano energy recovery facility will generate electricity from the excess pressure once the new tunnels connecting the Capilano reservoir and the Seymour water filtration system are fully tested and operational. See how crews tackled the tricky business of moving this large turbine into its permanent home.